A and B can complete a work in 15 days and 10 days respectively. They started doing the work together but after 2 days B had to leave and A alone completed the remaining work. The whole work was completed in:

8 days
10 days
12 days
15 days
Explanation:

Time taken by A to complete the work = 15 days

Time taken by B to complete the work = 10 days

Work done by A in a day = 1/15

Work done by B in a day = 1/10

Work done by A and B together in a day = 1/15 + 1/10 = 1/6

So work done by A and B together in a two days = 1/3

Work remaining when B leaves = 1 - 1/3 = 2/3

Now, A alone completes the remaining 2/3 work

Time taken by A to complete 2/3 work = 2/3 $\times$ 15 = 10 days.

So total time taken to complete the work = (2+ 10) days = 12 days.

Additional Questions

In covering a distance of 30 km, Abhay takes 2 hours more than Sameer. If Abhay doubles his speed, then he would take 1 hour less than Sameer. Abhays speed is:

Answer

In a class, there are 15 boys and 10 girls. Three students are selected at random. The probability that 1 girl and 2 boys are selected, is:

Answer

Rs.700 is divided among A, B and C so that A receives half as much as B and B half as much as C. Then C`s share is:

Answer

X and Y can do a piece of work in 20 days and 12 days respectively. X started the work alone and then after 4 days .Y joined him till the completion of the work. How long did the work last?

Answer

8 liters are drawn from a cask full of wine and is then filled with water. This operation is performed three more times. The ratio of the quantity of wine now left in cask to that of the water is 16 : 65. How much wine did the cask hold originally?

Answer

Seats for Mathematics, Physics and Biology in a school are in the ratio 5: 7: 8. There is a proposal to increase these seats by 40%, 50% and 75% respectively. What will be the ratio of increased seats?

Answer

HP Verbal Test

Synonym:

prevalent

Answer

Antonym:

onerous is most dissimilar to

Answer

Fill in the blank:

The reward was not commensurate __________ work done by us.

Answer

Error spotting:

Of the (1)/ two cars that you (2)/ have, the new Maruti is without (3)/ any question, the cheapest (4)/ to run.

Answer
Share with Friends
Privacy Copyright Contact Us