7 men can complete a work in 52 days. In how many days will 13 men finish the same work?
20 days
13 days
7 days
28 days
Additional Questions
If $\dfrac{a}{b}=\dfrac{9}{5}$,then $ \dfrac{a+b}{a-b}=?$ |
Answer | ||||||||||
Find the LCM of 45,4-81,412 and 47 |
Answer | ||||||||||
Find the missing number in the following: |
Answer | ||||||||||
The average of 4 values is 20 and when a quantity is added to each value the average is 22. Find the quantity. |
Answer | ||||||||||
Which of the following are correct? |
Answer | ||||||||||
Why the wings of an aeroplane are shaped with lower surface being flat and the upper surface being curved? |
Answer | ||||||||||
Match the folloing:
(a) (b) (c) (d) |
Answer | ||||||||||
Which one of the following is not an allotrope of carbon? |
Answer | ||||||||||
Match List I with List II, select the correct answer using the codes given in the options:
|
Answer | ||||||||||
Match the following:
|
Answer |