A and B start together from the same point on a circular track and walk in the same direction till they both again arrive together at the starting point. A completes one circle in 224 s and B in 364 s. How many times will A have passed B?
36 men can complete a piece of work in 18 days. In how many days will 27 men complete the same work ? |
Answer |
39 persons can repair a road in 12 days, working 5 hours a day. In how many days will 30 persons, working 6 hours a day, complete the work ? |
Answer |
If 7 spiders make 7 webs in 7 days, then 1 spider will make 1 web in how many days ? |
Answer |
Some persons can do a piece of work in 12 days. Two times the number of such persons will do half of that work in: |
Answer |
Ronald and Elan are working on an assignment. Ronald takes 6 hours to type 32 pages on a computer, while Elan takes 5 hours to type 40 pages. How much time will they take, working together on two different computers to type an assignment of 110 pages ? |
Answer |
A and B can do a work in 12 days, B and C in 15 days, C and A in 20 days. If A, B and C work together, they will complete the work in: |
Answer |
A and B can do a job together in 7 days. A is 7/4 times as efficient as B. The same job can be done by A alone in: |
Answer |
A and B can complete a work in 15 days and 10 days respectively. They started doing the work together but after 2 days B had to leave and A alone completed the remaining work. The whole work was completed in: |
Answer |
A, B and C together can complete a piece of work in 10 days. All the three started working at it together and after 4 days A left. Then B and C together completed the work in 10 more days. A alone could complete the work in: |
Answer |
One pipe can fill a tank three times as fast as another pipe. If together the two pipes can fill the tank in 36 minutes, then the slower pipe alone will be able to fill the tank in: |
Answer |