One pipe can fill a tank three times as fast as another pipe. If together the two pipes can fill the tank in 36 minutes, then the slower pipe alone will be able to fill the tank in:

81 min
108 min
144 min
192 min
Additional Questions

A large tanker can be filled by two pipes A and B in 60 minutes and 40 minutes respectively. How many minutes will it take to fill the tanker from empty state if B is used for half the time and A and B fill it together for the other half ?

Answer

Three taps A, B and C can fill a tank in 12, 15 and 20 hours respectively. If A is open all the time and B and C are open for one hour each alternately, the tank will be full in:

Answer

Two pipes can fill a tank in 20 and 24 minutes respectively and a waste pipe can empty 3 gallons per minute. All the three pipes working together can fill the tank in 15 minutes. The capacity of the tank is:

Answer

Ram and Shyam together do a work in 8 days. Both of them began to work. After 3 days Ram fell ill. Shyam completed the remaining work in 15 days. In how many days can Ram complete the whole work?

Answer

Two workers A and B were employed for a work. A takes 8 hour more than the time taken by A and B together. If B takes 4.5 hours more than the time taken by A and B together, how long would A and B take together to complete the work?

Answer

If 5 persons can do 5 times of a work in 5 days, then 10 persons can do 10 times of that work in:

Answer

Two taps can fill a cistern in 6 min. and 7 min. respectively. If these taps are opened alternatively for a minute, in what time will the cistern be filled?

Answer

Two taps A and B can fill a cistern in 28 min. and 42 min. respectively. Third tap C can empty it in 42 min. If all the three taps are opened, the time taken to fill the cistern is:

Answer

49 pumps can empty a reservoir in 6½ days, working 8 hours a day. If 196 pumps are used for 5 hours a day, then the same work will be completed in:

Answer

16 men complete one-fourth of a piece of work in 12 days. What is the additional number of men required to complete the work in 12 more days ?

Answer