Ram and Shyam together do a work in 8 days. Both of them began to work. After 3 days Ram fell ill. Shyam completed the remaining work in 15 days. In how many days can Ram complete the whole work?
Two workers A and B were employed for a work. A takes 8 hour more than the time taken by A and B together. If B takes 4.5 hours more than the time taken by A and B together, how long would A and B take together to complete the work? |
Answer |
If 5 persons can do 5 times of a work in 5 days, then 10 persons can do 10 times of that work in: |
Answer |
Two taps can fill a cistern in 6 min. and 7 min. respectively. If these taps are opened alternatively for a minute, in what time will the cistern be filled? |
Answer |
Two taps A and B can fill a cistern in 28 min. and 42 min. respectively. Third tap C can empty it in 42 min. If all the three taps are opened, the time taken to fill the cistern is: |
Answer |
49 pumps can empty a reservoir in 6½ days, working 8 hours a day. If 196 pumps are used for 5 hours a day, then the same work will be completed in: |
Answer |
16 men complete one-fourth of a piece of work in 12 days. What is the additional number of men required to complete the work in 12 more days ? |
Answer |
A takes thrice as long to do a piece of work, as B takes. A and B together can do a piece of work in 7.5 days. A alone can do in: |
Answer |
A cistern can be filled by two pipes A and B in 10 and 15 hours respectively and is then emptied by a tap in 8 hours. If all the taps are opened, the cistern will be fill in: |
Answer |
A locomotive engine, without any wagons |
Answer |
If 33 untrained labourers can do a work in 15 days of 12 hr. each, how many trained labourers can do 50% more work in 11 days of 9 hr each ? (It may be assumed that it takes 2 trained labourers to do the work of 5 untrained labourers) |
Answer |