Easy Tutorial
For Competitive Exams

A completes a work in 2 days, B in 4 days, C in 9 and D in 18 days. They form group of two such that difference is maximum between them to complete the work. What is difference in the number of days they complete that work?

14/5 days
14/3 days
16/2 days
18/4 days
Explanation:

If C and D form a pair and A and B form a pair the difference is maximum.

Now C and D together can complete the work = 9 $\times$ 189+18 = 6 days.

A and B together can complete the work = 2$\times$ 42+4 = 4/3 days.

Difference = 6 - 4/3 = 14/3 days.

Additional Questions

How many 4 digit numbers contain number 2.

Answer

How many three digit numbers abc are formed where at least two of the three digits are same.

Answer

How many kgs of wheat costing Rs.24/- per kg must be mixed with 30 kgs of wheat costing Rs.18.40/- per kg so that 15% profit can be obtained by selling the mixture at Rs.23/- per kg?

Answer

What is the next number of the following sequence 7, 14, 55, 110, ....?

Answer

How many numbers are divisible by 4 between 1 to 100

Answer

$\left(11111011\right)_{2}$ = $\left(\right)_{8}$

Answer

There are 1000 junior and 800 senior students in a class.And there are 60 sibling pairs where each pair has 1 junior and 1 senior. One student is chosen from senior and 1 from junior randomly.What is the probability that the two selected students are from a sibling pair?

Answer

161?85?65?89 = 100, then use + or - in place of ? and take + as m,- as n then find value of m-n.?

Answer

In a cycle race there are 5 persons named as J,K,L,M,N participated for 5 positions so that in how many number of ways can M finishes always before N?

Answer

Rahul took a part in cycling game where 1/5 ahead of him and 5/6 behind him excluding him. Then total number of participants are

Answer
Share with Friends
Privacy Copyright Contact Us